CN101053269A

5G,4G

Title

RESOURCE ALLOCATION IN COMMUNICATION NETWORKS

Application Number:

CN2004844331

Publication Date:

10-10-2007

Current Assignee:

Family ID:

Application Date:

29-10-2004

Publication Country:

US

Priority Date:

29-10-2004

Declaring Company:

Abstract  Abstract

The invention claims an adapting resource allocation parameter in order to find one or more quality goal methods with higher accuracy. Introducing the new information measuring based on the so called mutual information the first choose is on the block level. The transmitted information measuring based on MI the subsequent transmitted channel predict and one or more quality requirement are used for determining the number and type for the resource subsequent transmitted for instance time frequency and power resource. Resource allocating can comprise such as power allocation and/or link adaptation and this invention can realize a profitable implement wise with link adaptation of synergetic effect and power allocation. The method claimed is useful to the aspect of retransmitting ARQ/HARQ.

A method of adapting resource allocation parameters to reach one or more quality targets with improved accuracy is proposed. New information measurements based on the so-called mutual information preferably at block-level are introduced. The MI-based information measurements of a previous transmission the channel prediction of a subsequent transmission and one or more quality requirements are used to determine the amount and type of resources e.g. time frequency and power resources that are to be used for the subsequent transmission. The resource allocation can for example comprise power allocation and/or link adaptation and the invention enables an advantageous implementation with cooperative link-adaptation and power allocation. The proposed method is useful in connection with ARQ/HARQ retransmissions.

A method of adapting resource allocation parameters to reach one or more quality targets with improved accuracy is proposed. New information measurements based on the so-called mutual information preferably at block-level are introduced. The MI-based information measurements of a previous transmission the channel prediction of a subsequent transmission and one or more quality requirements are used to determine the amount and type of resources e.g. time frequency and power resources that are to be used for the subsequent transmission. The resource allocation can for example comprise power allocation and/or link adaptation and the invention enables an advantageous implementation with cooperative link-adaptation and power allocation. The proposed method is useful in connection with ARQ/HARQ retransmissions.

Note:

The information in blue was extracted from the third parties (Standard Setting Organisation, Espacenet)

The information in grey was provided by the patent holder

The information in purple was extracted from the FrandAvenue

Explicitly disclosed patent:openly and comprehensibly describes all details of the invention in the patent document.

Implicitly disclosed patent:does not explicitly state certain aspects of the invention, but still allows for these to be inferred from the information provided.

Basis patent:The core patent in a family, outlining the fundamental invention from which related patents or applications originate.

Family member:related patents or applications that share a common priority or original filing.